Projects

Jackdaw Helipad view from above

Jackdaw

The Jackdaw gas field is located approximately 250 kilometres east of Aberdeen. Jackdaw is expected to start production during this decade and could represent more than 6% of projected UK North Sea gas production, with operational emissions of less than 1% of the whole UK basin.

Large illuminated offshore production shipnamed Petrojarl Knarr docked in a harbour, with cranes and mountains visible in the background

Rosebank

The Rosebank field is located around 130 kilometres north-west of Shetland. The Rosebank field will be developed in two phases with subsea wells tied back to a redeployed Floating Production Storage and Offloading vessel (FPSO). Start-up from Phase 1 is planned in 2026-2027.